Parking is the first problem to solve. Downtown street parking is metered, and loading zones are typically limited to 15 or 30 minutes. That is not enough time to load a two-bedroom. We plan where the truck will sit before move day, use the building’s dock when there is one, and check with the city’s parking office when a temporary on-street space is the only option.
Events close streets. From October through May the Saturday Morning Market fills the Al Lang Stadium area on the waterfront from 9am to 2pm, and in summer a smaller market sets up near Williams Park. Every March the Firestone Grand Prix runs a street circuit around Pioneer Park, the Duke Energy Center for the Arts and Albert Whitted Airport, with track construction starting weeks before race weekend. We schedule around both.
High-rise rules are deadlines. Elevator bookings, COIs and move-in windows are set by the building, not by us. Get us the management contact early and the paperwork is done before your date is locked in.
Older buildings mean tighter stairs. Around Mirror Lake, historic homes and small apartment buildings sit along narrow courts and alleys. Roser Park, south of the core, is early twentieth-century housing on the slopes of Booker Creek. Tight landings and short approaches mean longer carries, and sometimes a smaller vehicle.
Heat and season both count. From June through September an afternoon load is hard on your furniture and our crew, so we start those moves early. January through April is busy season, and building elevator calendars fill faster then too.